SPACE PHOTOS

Estimate Request for the image S06653

To make a request for several images, go back to the Picture Library and add them to the Light Box.



Ref : S06653

Theme :  Testings - Satellites - Probes - Rockets  (2314 images)

Title : In the Operations and Checkout Building

Caption :

(10/02/2000) -- In the Operations and Checkout Building, the Joint Airlock Module is lowered toward a stand on the floor where it will be moved to a horizontal position. Then it will be lifted into the payload canister for transfer to the Space Station Processing Facility. There it will continue to undergo preflight processing for the STS-104 mission scheduled for launch aboard Space Shuttle Atlantis May 17, 2001. The Joint Airlock Module is the gateway from which crew members aboard the International Space Station will enter and exit the 470-ton orbiting research facility



to specify how you want to use these images. You can also send your request by E-mail
To make a request for several images, go back to the Picture Library and add them to the Light Box.

Image(s) use :
 
 
Reproduction format of the image in the final document :
 
 
Print run of the document on which the image is reproduced :
 
 
Number of consecutive uses :
 
 
If image is reproduced in the Press, please specify number of titles :
 
 
If image is reproduced as a poster
please specify size of the poster :
 
 
Give all useful information or specify the use of the image(s) in this box :