SPACE PHOTOS

Estimate Request for the image S07814

To make a request for several images, go back to the Picture Library and add them to the Light Box.



Ref : S07814

Theme :  Astronauts - Astronauts training  (1725 images)

Title : Suiting up in the Operations and Checkout Building

Caption :

(02/07/2001) --- Suiting up in the Operations and Checkout Building, STS-98 Mission Specialist Robert Curbeam has a thumbs-up for launch. STS-98 is the seventh construction flight to the International Space Station. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle’s robotic arm. Three spacewalks, by Curbeam and Mission Specialist Thomas Jones, are required to complete the planned construction work during the 11-day mission. Launch is targeted for 6:11 p.m. EST and the planned landing at KSC Feb. 18 about 1:39 p.m. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA’s Space Shuttle program



to specify how you want to use these images. You can also send your request by E-mail
To make a request for several images, go back to the Picture Library and add them to the Light Box.

Image(s) use :
 
 
Reproduction format of the image in the final document :
 
 
Print run of the document on which the image is reproduced :
 
 
Number of consecutive uses :
 
 
If image is reproduced in the Press, please specify number of titles :
 
 
If image is reproduced as a poster
please specify size of the poster :
 
 
Give all useful information or specify the use of the image(s) in this box :