SPACE PHOTOS

Estimate Request for the image S08385

To make a request for several images, go back to the Picture Library and add them to the Light Box.



Ref : S08385

Theme :  Testings - Satellites - Probes - Rockets  (2314 images)

Title : The new block 2 engine for the orbiter Atlantis is moved into place next to the

Caption :

(04/25/2001) -- The new block 2 engine for the orbiter Atlantis is moved into place next to the other two engines. The work is being done in the Orbiter Processing Facility bay 3. The engine will have its first flight on mission STS-104, scheduled for launch June 14. The Block II Main Engine configuration is manufactured by Boeing Rocketdyne in Canoga Park, Calif., and includes a new Pratt & Whitney high-pressure fuel turbo pump. Engine improvements are managed by NASA’s Marshall Space Flight Center in Huntsville, Ala. Each Space Shuttle Main Engine is 14 feet (4.3 meters) long, weighs about 7,000 pounds (3,175 kilograms), and is 7.5 feet (2.3 meters) in diameter at the end of the nozzle



to specify how you want to use these images. You can also send your request by E-mail
To make a request for several images, go back to the Picture Library and add them to the Light Box.

Image(s) use :
 
 
Reproduction format of the image in the final document :
 
 
Print run of the document on which the image is reproduced :
 
 
Number of consecutive uses :
 
 
If image is reproduced in the Press, please specify number of titles :
 
 
If image is reproduced as a poster
please specify size of the poster :
 
 
Give all useful information or specify the use of the image(s) in this box :