SPACE PHOTOS

Estimate Request for the image S10510

To make a request for several images, go back to the Picture Library and add them to the Light Box.



Ref : S10510

Theme :  Space Shuttle - General  (1045 images)

Title : The Space Shuttle Atlantis completes the trip to Launch Pad 39A from the Vehicle

Caption :

(08/20/1996) -- The Space Shuttle Atlantis completes the trip to Launch Pad 39A from the Vehicle Assembly Building for the third time in the STS-79 mission flow. The Shuttle was rolled back from the pad in July due to the threat from Hurricane Bertha, then rolled back again earlier this week because of Hurricane Fran. The targeted launch date for Atlantis on Mission STS-79 -- the fourth docking between the U.S. Shuttle and Russian Space Station Mir -- is now Sept. 16 at 4:54 a.m. EDT. The three rollout dates for Atlantis to Pad 39A are: July 1, Aug. 20 and Sept. 5



to specify how you want to use these images. You can also send your request by E-mail
To make a request for several images, go back to the Picture Library and add them to the Light Box.

Image(s) use :
 
 
Reproduction format of the image in the final document :
 
 
Print run of the document on which the image is reproduced :
 
 
Number of consecutive uses :
 
 
If image is reproduced in the Press, please specify number of titles :
 
 
If image is reproduced as a poster
please specify size of the poster :
 
 
Give all useful information or specify the use of the image(s) in this box :