Save this image free of charge in 800 pixels for layout use (right click, Save as...)
|
|
Ref : S07529
Theme :
Testings - Satellites - Probes - Rockets (2314 images)
Title : The Solar Array 3 panels are part of the STS109 flight hardware for maintenance
Caption :
(12/18/2001) --The Solar Array 3 panels are part of the STS-109 flight hardware for maintenance of the Hubble Space Telescope (HST). The panels and other hardware, installed on four principle payload carriers, are being processed inside the clean room at the Vertical Processing Facility (VPF). The STS-109 launch aboard Columbia is targeted for Feb. 14, 2002, and will be the 108th flight in the Space Shuttle program
|
|