SPACE PHOTOS

Estimate Request for the image S14145

To make a request for several images, go back to the Picture Library and add them to the Light Box.



Ref : S14145

Theme :  Testings - Satellites - Probes - Rockets  (2314 images)

Title : In the Payload Changeout Room

Caption :

(12/10/1999) --- In the Payload Changeout Room, Launch Pad 39B, United Space Alliance and NASA workers look at the replacement main propulsion system liquid hydrogen recirculation line (left) to be installed in Shuttle Discovery's aft compartment. At right is the dented line that has been removed. The 12-inch-long dent was discovered during routine aft compartment inspections Tuesday, Dec. 7. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. The line is being replaced and managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope



to specify how you want to use these images. You can also send your request by E-mail
To make a request for several images, go back to the Picture Library and add them to the Light Box.

Image(s) use :
 
 
Reproduction format of the image in the final document :
 
 
Print run of the document on which the image is reproduced :
 
 
Number of consecutive uses :
 
 
If image is reproduced in the Press, please specify number of titles :
 
 
If image is reproduced as a poster
please specify size of the poster :
 
 
Give all useful information or specify the use of the image(s) in this box :