SPACE PHOTOS

Estimate Request for the image S02520

To make a request for several images, go back to the Picture Library and add them to the Light Box.



Ref : S02520

Theme :  Space Shuttle - General  (1045 images)

Title : STS-36 Rollout

Caption :

The STS-36 vehicle and launch platform were rolled out to Launch Pad 39A on January 25 after the shortest stay in the Vehicle Assembly Building since return-to-flight. The distance between the VAB and Pad 39A is about 3.4 miles. Atlantis is being prepared for launch on Mission STS-36 dedicated to the Department of Defense. Launch is currently targeted for February 22.



to specify how you want to use these images. You can also send your request by E-mail
To make a request for several images, go back to the Picture Library and add them to the Light Box.

Image(s) use :
 
 
Reproduction format of the image in the final document :
 
 
Print run of the document on which the image is reproduced :
 
 
Number of consecutive uses :
 
 
If image is reproduced in the Press, please specify number of titles :
 
 
If image is reproduced as a poster
please specify size of the poster :
 
 
Give all useful information or specify the use of the image(s) in this box :