SPACE PHOTOS

Estimate Request for the image S10148

To make a request for several images, go back to the Picture Library and add them to the Light Box.



Ref : S10148

Theme :  Space Shuttle - General  (1045 images)

Title : After an early morning rollout

Caption :

(09/10/2002) -- After an early morning rollout, Space Shuttle Atlantis nears the top of the launch pad. The Rotating Service Structure is wide open (in front of the Mobile Launcher Platform). After being stacked with its solid rocket boosters and external tank, Atlantis began its rollout to Launch Pad 39B at 2:27 a.m. EDT in preparation for launch to the International Space Station. The Shuttle arrived at the Pad and was hard down at 9:38 a.m. Launch is scheduled no earlier than Oct. 2 for mission STS-112, the 15th assembly flight to the International Space Station. Atlantis will carry the S1 Integrated Truss Structure, which will be attached to the central truss segment, the S0 truss, during the mission.



to specify how you want to use these images. You can also send your request by E-mail
To make a request for several images, go back to the Picture Library and add them to the Light Box.

Image(s) use :
 
 
Reproduction format of the image in the final document :
 
 
Print run of the document on which the image is reproduced :
 
 
Number of consecutive uses :
 
 
If image is reproduced in the Press, please specify number of titles :
 
 
If image is reproduced as a poster
please specify size of the poster :
 
 
Give all useful information or specify the use of the image(s) in this box :