SPACE PHOTOS

Estimate Request for the image S11131

To make a request for several images, go back to the Picture Library and add them to the Light Box.



Ref : S11131

Theme :  Space Shuttle - Landing  (358 images)

Title : With the Mate/Demate Device (MDD) on the left and the Vehicle Assembly Building

Caption :

(01/22/1997) -- With the Mate/Demate Device (MDD) on the left and the Vehicle Assembly Building (VAB) on the right, the Space Shuttle orbiter Atlantis approaches Runway 33 at KSC’s Shuttle Landing Facility for a scheduled touchdown at about 9:23 a.m. EST Jan. 22. When the orbiter lands, it will conclude the fifth Shuttle-Mir docking mission and return NASA astronaut John Blaha to Earth after four months in space. At main gear touchdown, the STS-81 mission duration will be 10 days, 4 hours, 55 minutes. This is the 34th KSC landing in Shuttle history. Mission Commander Michael A. Baker is steering Atlantis to a perfect landing, with help from Pilot Brent W. Jett, Jr. Other returning STS-81 crew members are Mission Specialists John M. Grunsfeld, Peter J. K. 'Jeff' Wisoff and Marsha S. Ivins. Atlantis also brought back experiment samples from the Russian space station Mir for analysis on Earth



to specify how you want to use these images. You can also send your request by E-mail
To make a request for several images, go back to the Picture Library and add them to the Light Box.

Image(s) use :
 
 
Reproduction format of the image in the final document :
 
 
Print run of the document on which the image is reproduced :
 
 
Number of consecutive uses :
 
 
If image is reproduced in the Press, please specify number of titles :
 
 
If image is reproduced as a poster
please specify size of the poster :
 
 
Give all useful information or specify the use of the image(s) in this box :